Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Request form for DPC storm payment.
Last updated: 5/9/2022
Project management manual for Developer Participation Contracts (DPCs)
Last updated: 5/9/2022
Template for Notice to Proceed letters for Developer Participation Contracts.
Last updated: 3/18/2022
Developer Participation Contract (DPC) checklist for developers.
Last updated: 3/21/2022
The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.
Last updated: 1/4/2017
Last updated 04/15/2020
Form for registering a master plumber license or landscape irrigator license with the City of Houston
Last updated: Feb. 24, 2023
Application packet to become a licensed sign contractor
Last updated: May 11, 2023
Registration and renewal procedures for Independent Third-Party Technician
Last updated: January 2024
When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.
Last updated: 01-30-2024