Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Request Storm Payment Form

Request form for DPC storm payment.

Last updated: 5/9/2022

DPC Manual

Project management manual for Developer Participation Contracts (DPCs)

Last updated: 5/9/2022

00551 Notice to Proceed

Template for Notice to Proceed letters for Developer Participation Contracts.

Last updated: 3/18/2022

Live-Work Program (CE1277)

This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.

Last updated: 2/13/2019

Occupancy Inspections for Existing Buildings (CE1278)

This guide provides the qualifications and submittal requirements for requesting a Certificate of Occupancy for existing buildings.

Last updated: 2/12/2019

Checklist 30pct 50pct And 70pct For Developer Participation Contract

Developer Participation Contract (DPC) checklist for developers.

Last updated: 3/21/2022

Overview of the General Commercial Permit Process (CE1279)

This brochure is intended to provide a very high level overview of the commercial building permit process.

Last updated: 1/1/2019

Energy Compliance Information Certificate

The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.

Last updated: 1/4/2017

00455 Affidavit of Ownership or Control Form

Last updated 04/15/2020

Independent Third Party Energy Technician Registration Guidelines (CE1217)

Registration and renewal procedures for Independent Third-Party Technician

Last updated: January 2024