Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Review Cycle Detail Redlines
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated 07/14/2020

Frequently Missed Inspection Items (CE1354)

Last updated: 11/22/2019

00495 Post Bid Procedures
Review Cycle Specification Redlines

2019-2020 Review Cycle Standard Specifications Redlines

2022 Review Cycle Comment Form

Last Update: 7.7.22

Review Cycle Infrastructure Design Manual Redlines

2020 IDM redlines

 

2022 - 2023 Review Cycle Public Notice
Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021