Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Review Cycle Specification Redlines

2019-2020 Review Cycle Standard Specifications Redlines

Review Cycle Detail Redlines
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021

Review Cycle Infrastructure Design Manual Redlines

2020 IDM redlines

 

Frequently Missed Inspection Items (CE1354)

Last updated: 11/22/2019

Care Facilities Worksheet (CE1108)

To assist in correctly identifying the intended occupancy Group of care facilities, the facility owner shall provide a completed, sign and notarized worksheet with all applications submitted for building permit, plan review, or occupancy inspection.

Updated: 10/10/2019

2023 Review Cycle Comment Form

Last Update: July 30, 2023

00495 Post Bid Procedures