Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Review Cycle Specification Redlines

2019-2020 Review Cycle Standard Specifications Redlines

Review Cycle Detail Redlines
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021

20-02-R Residential Non-Fire Rated Wall Section Template (Two Story - Siding)

The template drawing is to assist in the preparation of plans for residential remodeling and addition projects

22-07-R Residential Framing Cross Section Template

The template drawing is to assist in the preparation of plans for residential remodeling and addition projects.

Revised 11-15-2022

Review Cycle Infrastructure Design Manual Redlines

2020 IDM redlines

 

Frequently Missed Inspection Items (CE1354)

Last updated: 11/22/2019

22-08-R, 1 Hour Fire-Rated Wood Stud Exterior Wall, Multi-Story

Drawings may be used to document a 1-hour fire rated exterior wall design for wood framed structures located less than 5-feet to the property line after the effective dates of the adopted 2015 IBC and IRC codes.

Rev 1/17/2023