Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Review Cycle Specification Redlines
2019-2020 Review Cycle Standard Specifications Redlines
2023-2024 Review Cycle Public Notice
Review Cycle Detail Redlines
Construction Services - Required Site Signage
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)
This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.
Last updated: March 2024
Food Service Manager's Certification Manual
Occupancy Compliance Inspection Handout
All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.
Revised 06-04-2021
2023 Division 01 General Requirements Specifications
2023 edition of Division 01 General Requirements Specifications
Review Cycle Infrastructure Design Manual Redlines
2020 IDM redlines