Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Review Cycle Specification Redlines

2019-2020 Review Cycle Standard Specifications Redlines

Review Cycle Detail Redlines
Construction Services - Required Site Signage
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

01145S Use Of Premises

Supplemental Specification to 01145 Use of Premises

Food Service Manager's Certification Manual
Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021

2023 Division 01 General Requirements Specifications

2023 edition of Division 01 General Requirements Specifications

Review Cycle Infrastructure Design Manual Redlines

2020 IDM redlines