Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Approved Storm Water Products
Approved Wastewater Product List

Approved wastewater products

Last updated: March 7, 2024

Approved Wastewater Products
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

Approved Water Product List

Approved water products by the Design and Construction Standards Group

Last updated: April 5, 2024

Sidewalk Panel Replacement Guide

Sidewalk Panel Replacement Guide.

Approved Street and Bridge Products
Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021

Sidewalk Panel Completion

Notice of completion for sidewalk panel replacement work.

Notice of Sidewalk Panel Replacement

Notice to begin sidewalk panel replacement work.