Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Review Cycle Specification Redlines
2019-2020 Review Cycle Standard Specifications Redlines
2023-2024 Review Cycle Public Notice
Review Cycle Detail Redlines
2022 Presentation Slides
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)
This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.
Last updated: March 2024
2022 PPSLA Completion Instructions
2023 IDM Presentation Slides
Occupancy Compliance Inspection Handout
All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.
Revised 06-04-2021
Review Cycle Infrastructure Design Manual Redlines
2020 IDM redlines
Frequently Missed Inspection Items (CE1354)
Last updated: 11/22/2019