Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Special Specification Template
DPC Manual

Project management manual for Developer Participation Contracts (DPCs)

Last updated: 5/9/2022

Definition of Terms

Definition of terms for project managers.

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

Master Unit Price Item List
220706_Project Specific Supplemental Specification

07/06/2022

Airport Land Use - Sound Attenuation Form (CE1202)

This form is to assist in the plan review, permit and inspection process for those properties that have been required by the Airport Land Use ordinance to meet sound attenuation requirements. This form is to be completed by the designer or builder to ensure that either the prescriptive code requirements are met or an approved assembly is utilized to meet the requirements in the building code.

Last updated: March 2024

Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021

Standard Supplemental Specification Template
Temporary Building Permit Application (CE1210)

Application to request the Building Official's approval for a proposed temporary building (< 180 days)

Updated April 2024