Use a mixture of filters or keywords to find documents and resources by department, type or topic.
2011 NEC amendments
2006 Uniform Mechanical Code (UMC) Houston Amendments.
The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.
Revised 08/15/2023
2006 IRC amendments
This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.
Last Updated: 01/01/2023
2006 UPC amendments
2009 IECC commercial amendments
2014 National Electrical Code (NEC) Houston Amendments.
2006 IBC amendments
2006 IFC amendments