Use a mixture of filters or keywords to find documents and resources by department, type or topic.
2019-2020 Review Cycle Standard Specifications Redlines
The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.
Revised 08/15/2023
The 2022 edition of Division 01 - General Requirements Specifications
Last updated: July 28, 2022
Historical groundwater plant design guidelines
Last updated: Jan. 2011
This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.
Last Updated: 01/01/2023
Memo for restrict flood bond projects to municipalities.
Cover letter explaining the supplemental changes made to Chapter 9 of the Infrastructure Design Manual.
Last updated: January 26, 2021