Use a mixture of filters or keywords to find documents and resources by department, type or topic.

2022 IDM Redlines
ERRC Initial Grid Test Report (Pre-test) (CE-1386)

The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.

 

Revised 08/15/2023

2022 Division 01 General Requirements Specifications

The 2022 edition of Division 01 - General Requirements Specifications

 

Last updated: July 28, 2022

Historical Groundwater Plant Design Guidelines

Historical groundwater plant design guidelines

Last updated: Jan. 2011

Sizing of Heating and Cooling Equipment and Ducts - Commercial (CE1300)

This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.

Last Updated: 01/01/2023

Harris County Records Memo

Memo for restrict flood bond projects to municipalities.

IDM Chapter 9 storm detention cover letter

Cover letter explaining the supplemental changes made to Chapter 9 of the Infrastructure Design Manual.

 

Last updated: January 26, 2021

2022 IDM Cover Letter and Executive Summary

Executive summary and cover letter for the 2022 edition of the Infrastructure Design Manual

 

Last updated: July 1, 2022

Current Groundwater Plant Design Guidelines

Current groundwater plant design guidelines (effective Oct. 1, 2021)

Last updated: July 1, 2021

IDM Chapter 9.2.01 Supplement

Chapter 9.2.01 supplement for design rainfall events, pipe sizes and placement, and inlet