Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Instructions to Enter Your Information on Bond Form
2022 IDM Redlines
New Permit Instructions
How to Amend a Storm Water Quality Permit
2022 Division 01 General Requirements Specifications

The 2022 edition of Division 01 - General Requirements Specifications

 

Last updated: July 28, 2022

Historical Groundwater Plant Design Guidelines

Historical groundwater plant design guidelines

Last updated: Jan. 2011

Signs EPR User Gudie

Electronic plan review user guide for sign projects

Harris County Records Memo

Memo for restrict flood bond projects to municipalities.

Airport Land Use - Sound Attenuation Form (CE1202)

This form is to assist in the plan review, permit and inspection process for those properties that have been required by the Airport Land Use ordinance to meet sound attenuation requirements. This form is to be completed by the designer or builder to ensure that either the prescriptive code requirements are met or an approved assembly is utilized to meet the requirements in the building code.

Last updated: March 2024

IDM Chapter 9 storm detention cover letter

Cover letter explaining the supplemental changes made to Chapter 9 of the Infrastructure Design Manual.

 

Last updated: January 26, 2021