Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Procedures and qualifications for paid plan review (customer paid overtime).
Last updated: 1/1/2020
This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.
Last updated: 01-01-2023
This handout was created to aid customers with understanding the permit and inspection process to install a residential standby generator. Included are the required permits, items that must be available to city field inspectors at the construction site, and the items that the city inspectors will be verifying in the field during the inspection process.
Last updated: 01/01/2023
Guidelines for a successful mylar walk through.
Last updated: 12/6/2019
Extraterritorial Jurisdiction “ETJ” is all unincorporated territory extending 5 miles beyond the corporate boundaries of the city limits of Houston as established by Chapter 42 – Texas Local Government code.
Last updated: 01/01/2022
The 2015 Houston Commercial Energy Conservation Code with local Amendments, effective December 9th, 2016, contains mandatory cool roofing provisions for new commercial buildings and alterations to existing commercial buildings.
Updated: 10/16/2019
Options for phase construction permitting and plan review
Last updated: 12/28/2022
To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review.
Last updated: February 2024
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: 01-01-2024
To provide a means for expediting the plan review of large commercial design projects prepared by professional (licensed architect/engineer) designers, and which are ready for final plan re-submittal for minimal corrections. A paid review meeting may be scheduled to review corrections for permit issuance
Last updated: 08-02-2023