Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Application to request the Building Official's approval for a proposed temporary building (< 180 days)
Updated April 2024
This form is to be completed by the applicant to obtain a minor repair permit for work that does not require a plan review provided the materials match or are equivalent to the materials being repaired or replaced.
Updated: 05/17/2022
Frequently asked questions about flood damage repair in the floodplain.
Last updated: 10/09/2019
Request for deferred plan submittal.
Last updated: 03-23-2022
Last updated: 5/9/2018
Frequently asked questions about mitigation in the floodplain.
For reroof only commercial projects.
Last updated: April 2024
When a fill or excavation permit is required, two sets of drawings must be provided that will clearly show the proposed scope of work and include the existing site elevations and the proposed site elevations.
Last updated: 10/10/2019
Frequently asked questions about substantial improvements in the floodplain.