Phased Construction Permitting Options (CE1098)

Options for phase construction permitting and plan review

Last updated: 12/28/2022

COH Plot Table

Plot Table

Storm Plan Review Walk-in Service Guidelines (OCE-0006)

Qualifications and procedures for storm drainage plan review virtual "walk-in" service. New guidelines are effective Jan. 30, 2023. 

Modular Building Submittal Requirements (CE1099)

To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review. 

Last updated: February 2024

Water Main Abandonment Procedure

Procedures for obtaining a water main abandonment permit.

Last updated: 1/1/2019

Multi-Family Habitability Article IV
Cosmetic Wash Water Guidelines

Best management practices for cosmetic wash water.

Last update: 4/30/2008

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2024

HPW SWQ Structural Control Bond
Fire Hydrant Installation and Relocation Procedure

Procedures for obtaining a permit to install or relocate a fire hydrant.

Last updated: 7/1/2017