Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

17-08-R Emergency Escape and Rescue Windows (Examples)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

17-10-C Repair of Flooded 2-Hour Fire Wall

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

10-09-C Encroachment into the Public Right of Way

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021

17-13-R Elevation Examples

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.   

18-13-R Residential Non Fire-Rated Stucco Details (Wood Frame)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

19-04-M One Hour Exterior Wall Membrane Penetration

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Frequently Missed Inspection Items (CE1354)

Last updated: 11/22/2019

15-02-C 2 Hour Fire Wall