Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Instructions to Enter Your Information on Bond Form
New Permit Instructions
How to Amend a Storm Water Quality Permit
17-08-R Emergency Escape and Rescue Windows (Examples)
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
17-10-C Repair of Flooded 2-Hour Fire Wall
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
How to View and Respond to OCE Comments
This guide shows users how to view and respond to plan review comments in ProjectDox for projects submitted to the Office of the City Engineer.
Last updated: 08/17/2022
10-09-C Encroachment into the Public Right of Way
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Commercial EPR Guide (Spanish)