Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Review Cycle Specification Redlines

2019-2020 Review Cycle Standard Specifications Redlines

Review Cycle Detail Redlines
Lift Station Guideline Title Index

Design guideline drawings for submersible lift stations Civil, Mechanical, and Structural drawing set

6 Pump VFD Pump System

6 VFD Pump System

08R12 Residential Block Foundations (Revision 1)
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

10-06-R Residential Concrete Bonding Detail

Residential concrete bonding detail for non-load bearing slab and for new slab bearing a wall.

Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021

6 Pump System

Design guideline drawings for Submersible Lift Station 6 Pump System