Use a mixture of filters or keywords to find documents and resources by department, type or topic.

2016 Design Manual For Submersible Lift Stations

Engineering Design Manual for Submersible Lift Stations July 2016

2022 IDM Redlines
ERRC Initial Grid Test Report (Pre-test) (CE-1386)

The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.

 

Revised 08/15/2023

2022 Division 01 General Requirements Specifications

The 2022 edition of Division 01 - General Requirements Specifications

 

Last updated: July 28, 2022

Historical Groundwater Plant Design Guidelines

Historical groundwater plant design guidelines

Last updated: Jan. 2011

Sizing of Heating and Cooling Equipment and Ducts - Commercial (CE1300)

This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.

Last Updated: 01/01/2023

Harris County Records Memo

Memo for restrict flood bond projects to municipalities.

2023 List of Standard Details_Tree & Hardscape Details.pdf

List of Standard Details-Tree and Hardscape Details

Chapter 13 2021
IDM Chapter 9 storm detention cover letter

Cover letter explaining the supplemental changes made to Chapter 9 of the Infrastructure Design Manual.

 

Last updated: January 26, 2021