Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Easement Reverter Flowchart

Easement Reverter Flowchart. 
This document maintained by the Joint Referral Committee.

2022 IDM Redlines
ERRC Initial Grid Test Report (Pre-test) (CE-1386)

The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.

 

Revised 08/15/2023

2022 Division 01 General Requirements Specifications

The 2022 edition of Division 01 - General Requirements Specifications

 

Last updated: July 28, 2022

Historical Groundwater Plant Design Guidelines

Historical groundwater plant design guidelines

Last updated: Jan. 2011

Sizing of Heating and Cooling Equipment and Ducts - Commercial (CE1300)

This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.

Last Updated: 01/01/2023

Harris County Records Memo

Memo for restrict flood bond projects to municipalities.

IDM Chapter 9 storm detention cover letter

Cover letter explaining the supplemental changes made to Chapter 9 of the Infrastructure Design Manual.

 

Last updated: January 26, 2021

2022 IDM Cover Letter and Executive Summary

Executive summary and cover letter for the 2022 edition of the Infrastructure Design Manual

 

Last updated: July 1, 2022

Current Groundwater Plant Design Guidelines

Current groundwater plant design guidelines (effective Oct. 1, 2021)

Last updated: July 1, 2021