Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Easement Reverter Flowchart

Easement Reverter Flowchart. 
This document maintained by the Joint Referral Committee.

17-08-R Emergency Escape and Rescue Windows (Examples)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

17-10-C Repair of Flooded 2-Hour Fire Wall

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Airport Land Use - Sound Attenuation Form (CE1202)

This form is to assist in the plan review, permit and inspection process for those properties that have been required by the Airport Land Use ordinance to meet sound attenuation requirements. This form is to be completed by the designer or builder to ensure that either the prescriptive code requirements are met or an approved assembly is utilized to meet the requirements in the building code.

Last updated: March 2024

Request For Acknowledgment Of Easement Reverter

Request For Acknowledgment Of Easement Reverter.
This document maintained by the Joint Referral Committee.

10-09-C Encroachment into the Public Right of Way

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Easement Reverter Guidelines

Easement Reverter Guidelines.
This document maintained by the Joint Referral Committee.

17-13-R Elevation Examples

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.   

Temporary Building Permit Application (CE1210)

Application to request the Building Official's approval for a proposed temporary building (< 180 days)

Updated April 2024

Commercial Minor Repair Spec List (CE1112)

This form is to be completed by the applicant to obtain a minor repair permit for work that does not require a plan review provided the materials match or are equivalent to the materials being repaired or replaced.

Updated: 05/17/2022