Use a mixture of filters or keywords to find documents and resources by department, type or topic.
ERRC Initial Grid Test Report (Pre-test) (CE-1386)
The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.
Revised 08/15/2023
Sizing of Heating and Cooling Equipment and Ducts - Commercial (CE1300)
This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.
Last Updated: 01/01/2023
2021 Chapter 4
2020 Chapter 14
2021 Chapter 5
Standard Details Redlines 2020-2021 Review Cycle
2020 Chapter 7
2022 Chapter 17
2020 Chapter 11
2022 Chapter 16