Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Review Cycle Specification Redlines

2019-2020 Review Cycle Standard Specifications Redlines

Review Cycle Detail Redlines
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021

Review Cycle Infrastructure Design Manual Redlines

2020 IDM redlines

 

Frequently Missed Inspection Items (CE1354)

Last updated: 11/22/2019

CE-1397 Commercial Energy Efficiency Certificate

The Commercial Energy Efficiency Certificate shall be posted in accordance with Section C401.3 of the 2021 International Energy Conservation Code. 

Last updated: 03/08/2024

2023 Review Cycle Comment Form

Last Update: July 30, 2023

Commissioning in Plans Guideline (CE1190)

Commissioning statement for the mechanical systems, service water heating systems, and building envelope.

Last updated: February 2024