Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

Flood Damage Repair Checklist for Commercial and Multifamily Residential Properties

Checklist for obtaining a floodplain development permit for flood damage repair to a commercial or multifamily residential property.

Checklist 30pct 50pct And 70pct For Developer Participation Contract

Developer Participation Contract (DPC) checklist for developers.

Last updated: 3/21/2022

Phased Construction Permitting Options (CE1098)

Options for phase construction permitting and plan review

Last updated: 12/28/2022

COH Plot Table

Plot Table

Storm Plan Review Walk-in Service Guidelines (OCE-0006)

Qualifications and procedures for storm drainage plan review virtual "walk-in" service. New guidelines are effective Jan. 30, 2023. 

Modular Building Submittal Requirements (CE1099)

To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review. 

Last updated: February 2024

Water Main Abandonment Procedure

Procedures for obtaining a water main abandonment permit.

Last updated: 1/1/2019

Easement Survey Checklist

Checklist for obtaining approval on easement surveys.

Multi-Family Habitability Article IV