Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Special Specification Template
ERRC Initial Grid Test Report (Pre-test) (CE-1386)

The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.

 

Revised 08/15/2023

DPC Manual

Project management manual for Developer Participation Contracts (DPCs)

Last updated: 5/9/2022

Definition of Terms

Definition of terms for project managers.

Sizing of Heating and Cooling Equipment and Ducts - Commercial (CE1300)

This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.

Last Updated: 01/01/2023

Master Unit Price Item List
220706_Project Specific Supplemental Specification

07/06/2022

Standard Supplemental Specification Template
Mechanical Inspection Request Form for Occupied Residences (CE1048)

This form is to be used for occupied residences only. Form must be received at least one day before the requested inspection date.

Revised 03/08/2024

Release of Trade Contractor (CE1304)

Release of trade contractors.

Last updated: January 2024