Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Request for deferred plan submittal.
Last updated: 03-23-2022
Last updated: 5/9/2018
For reroof only commercial projects.
Last updated: April 2024
For the inability to pay permit fee for non-revenue generating parade.
Builder's bond for sidewalk, driveway, curb and gutter. Bond period of less than one year.
Sworn statement relating to criminal offenses for the owner or operator of a boarding home facility.
When a fill or excavation permit is required, two sets of drawings must be provided that will clearly show the proposed scope of work and include the existing site elevations and the proposed site elevations.
Last updated: 10/10/2019
Last updated 04/15/2020
This form is to be completed by the applicant to obtain permits for work that does not require a plan review provided the materials match or are equivalent to the materials being repaired or replaced.
Updated: April 2024
The code provisions applicable to facilities with hazardous materials, high hazard and high-piled combustible storage depends on the type of products (commodities) stored and the arrangement and height of the storage.
Last updated: 5/11/2018