Use a mixture of filters or keywords to find documents and resources by department, type or topic.

30 Percent Contract
50 Percent Contract
70 Percent Contract
2022 IDM Redlines
Affidavit DPC Section IIE Certification
2022 Division 01 General Requirements Specifications

The 2022 edition of Division 01 - General Requirements Specifications

 

Last updated: July 28, 2022

Historical Groundwater Plant Design Guidelines

Historical groundwater plant design guidelines

Last updated: Jan. 2011

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

Harris County Records Memo

Memo for restrict flood bond projects to municipalities.

IDM Chapter 9 storm detention cover letter

Cover letter explaining the supplemental changes made to Chapter 9 of the Infrastructure Design Manual.

 

Last updated: January 26, 2021