Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Review Cycle Specification Redlines
2019-2020 Review Cycle Standard Specifications Redlines
2023-2024 Review Cycle Public Notice
Review Cycle Detail Redlines
30 Percent Contract
50 Percent Contract
70 Percent Contract
Affidavit DPC Section IIE Certification
17-08-R Emergency Escape and Rescue Windows (Examples)
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
17-10-C Repair of Flooded 2-Hour Fire Wall
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
10-09-C Encroachment into the Public Right of Way
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.