Use a mixture of filters or keywords to find documents and resources by department, type or topic.

30 Percent Contract
50 Percent Contract
Lift Station Guideline Title Index

Design guideline drawings for submersible lift stations Civil, Mechanical, and Structural drawing set

70 Percent Contract
Affidavit DPC Section IIE Certification
6 Pump VFD Pump System

6 VFD Pump System

08R12 Residential Block Foundations (Revision 1)
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

10-06-R Residential Concrete Bonding Detail

Residential concrete bonding detail for non-load bearing slab and for new slab bearing a wall.

Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021