Use a mixture of filters or keywords to find documents and resources by department, type or topic.

30 Percent Contract
50 Percent Contract
Trabajos de reparacion residencial de danos por tormentas

Storm damage repair guidelines for single-family homes and duplexes in Spanish.

Last updated: 9/20/2017

70 Percent Contract
Affidavit DPC Section IIE Certification
ERRC Initial Grid Test Report (Pre-test) (CE-1386)

The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.

 

Revised 08/15/2023

Sizing of Heating and Cooling Equipment and Ducts - Commercial (CE1300)

This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.

Last Updated: 01/01/2023

CE_1091 Model Home Brochure

Last Updated: 9.14.22

Guia para construir una cochera

Requerimientos para Permisos de Construcción e Información (Carport requirements brochure in Spanish)

 

House Moving brochure (CE1290)

Permitting and inspection information for house moving.

Last updated: 12-11-2023