Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Trabajos de reparacion residencial de danos por tormentas

Storm damage repair guidelines for single-family homes and duplexes in Spanish.

Last updated: 9/20/2017

Ejemplo de la Solicitud de Permiso de Edificacion (CE1263S)

Ejemplo de la Solicitud de Permiso de Edificacion (example building permit application in Spanish)

Solicitud para la ocupacion, inspeccion de acatamiento (CE1045s)

Solicitud para la ocupacion, inspeccion de acatamiento (occupancy application in Spanish)

Last updated: January 2024

Commercial EPR Guide (Spanish)
Lista de especificaciones para reparaciones residenciales (CE1059S)

Este formulario debe ser completado por el solicitante para obtener permisos para trabajos que no requieren una revisión del plano siempre y cuando los materiales sean iguales o equivalentes a los materiales que van a ser reparados o reemplazados.

Residential Repair Spec List in Spanish.

Last updated: January 2024

Hoja de trabajo para permisos para nivelar excavaciones y rellenado (CE1094s)

Hoja de trabajo para permisos para nivelar excavaciones y rellenado (Grading and fill worksheet in Spanish)

Last updated: 10/16/2019

Energy Compliance Information Certificate

The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.

Last updated: 1/4/2017

Independent Third Party Energy Technician Registration Guidelines (CE1217)

Registration and renewal procedures for Independent Third-Party Technician

Last updated: January 2024

Residential EPR Guide (Spanish)
Energy Testing Results (CE1302)

When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.

Last updated: 01-30-2024