Use a mixture of filters or keywords to find documents and resources by department, type or topic.
The 2022 edition of Division 01 - General Requirements Specifications
Last updated: July 28, 2022
Historical groundwater plant design guidelines
Last updated: Jan. 2011
Memo for restrict flood bond projects to municipalities.
Cover letter explaining the supplemental changes made to Chapter 9 of the Infrastructure Design Manual.
Last updated: January 26, 2021
Executive summary and cover letter for the 2022 edition of the Infrastructure Design Manual
Last updated: July 1, 2022
Quick reference handout listing Building Code Enforcement's licenses, annual permits, and miscellaneous permit fees, effective January 1, 2024.
Updated: 1/1/2024
Current groundwater plant design guidelines (effective Oct. 1, 2021)
Last updated: July 1, 2021
Chapter 9.2.01 supplement for design rainfall events, pipe sizes and placement, and inlet
Log of variance requests received by the City Engineer.
Last updated: 6/11/2019