Use a mixture of filters or keywords to find documents and resources by department, type or topic.
DPC Manual
Project management manual for Developer Participation Contracts (DPCs)
Last updated: 5/9/2022
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)
This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.
Last updated: March 2024
Master Unit Price Item List
220706_Project Specific Supplemental Specification
07/06/2022
Occupancy Compliance Inspection Handout
All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.
Revised 06-04-2021
Frequently Missed Inspection Items (CE1354)
Last updated: 11/22/2019