Storm Sewer Permit

Instrument Reference Number
HPWOCE1028
Valid Period
1 year
Inspection
Required
Renewal
Not Required
Plan Review
Not Required
Fee
$89.81
Admin fee
$33.10
Processing Time
2-3 business days
About

Connection to the City storm sewer from inside the property; abandonment of sewer connection; replacement work in the city right-of-way.

Conditions and Exceptions

Requires Plan Review for Utilities in the Right of Way prior to applying for permit.

Apply What you need

1. Permit application fee

2. One completed application

3.Copy of the excavation (street cut) permit

4. Two sets of approved plans (24”x36”, make sure that the plans approval dates are less than one year)

Apply Online Steps
Apply in Person Steps

1. Bring the completed application and required documents to the 2nd floor. 2. Bring the sales order to the Cashier Booth on the first floor to complete payment for the plan review fee. 3. Bring the payment receipt to the Intake Window on the 2nd floor. Permit will be issued.

Inspection What you need

Full-Sized Plans (24x36) Approved by the City Engineer's Office

 

 

 

 

Inspection Schedule by Phone Steps

After the permit is issued, all related paperwork will be sent to the Construction Services Section. The customer must contact the assigned inspector listed on the permit to schedule an inspection, which must be arranged 48 hours in advance.