Small Meter

Instrument Reference Number
HPWUA1011
Areas of Interest
Valid Period
Your permit application is valid 180 days from the time you receive a WNS permit application number.
Inspection
Required
Renewal
Not Required
Plan Review
Required
Fee
$87.56 to $887.16
Processing Time
35 to 40 minutes
About

Small Domestic Meters

Small domestic water meters are any size meter that is 2” and smaller that may service a permanent structure that can be for residential, multi-family, commercial, or government use. Please see the instructions on how to apply for a Domestic meter.

Small Irrigation Meters

Small irrigation water meters that are 2” and smaller and used for plant or landscape irrigation purposes only. They may be used as an additional meter on a property with a Domestic meter, or to irrigate vacant lands such as land along the right-of-way, esplanades, parks, and private property. Please see the instructions on how to apply for an Irrigation meter.

Ultrasonic Fire-rated meters

Ultrasonic meters are small water meters that are 2” and smaller that are used when there is a fire suppression system required for your development.

After Approval

When Taps & Meters approves your application you will be given a Water New Service (WNS) number. The WNS number will be your identifier for your permit for any future updates.

After Taps & Meters approves your small water meter application it is completed by the Customer Account Services (CAS) New Service group. CAS New Service is responsible for issuing the invoice for your small water meter permit and setting up new water accounts. If any water or drainage accounts associated with your site are not in good standing, you will not be able to purchase your permit until the account issues are resolved. If you have a billing issue and Customer Account Service at HPC has given you instruction to call the CAS Call Center, you can reach them at 713-371-1400. If you have a billing issue the CAS Call Center is your point of contact to update existing accounts. We are unable to update existing accounts at the Houston Permitting Center.

If you have questions about your permit invoice or work order status, please email CAS New Service at [email protected]. Provide your service address and WNS number.

Once you pay your invoice the plumber of your choice will receive a permit work order from Customer Account Services within 10-15 business days, communicating that the inspection can be set up with the Inspections group and your plumber.

Conditions and Exceptions
  1. The property must have direct access to City of Houston water mains. Property that does not have direct access to water mains require prior approval from the Infrastructure Support Group.
  2. The water main must be at least 4” in size and less than 20”. Property with direct access to water mains 20” and larger require prior approval
  3. The tap must be the same size as the water meter excluding the 5/8” meter which has a 3/4” tap.
  4. Impact fees, if required, must be paid before the water meter can be set up. Projects with conditional WCR letters, House for House and/or qualifying impact fee exemption residential development are exempt from impact fee payment prior to water meter set up.
  5. A contractor from the City of Houston Taps and Meters Approved Contractors List shall be selected to install the meter. The City does not install water meters nor does it pay for the installation. The list is updated on the first of each month.
Apply What you need
    • Online Small Water Meter application form
    • A copy of the Recorded Warranty Deed and
    • A copy of the IRS Form SS-4 or 4168C or LTR 147C for the EIN MUST be submitted BEFORE the application will be processed by Customer Account Services.

    Review the Small Meter Permit Requirements Guide for additional requirements related to your use. 

    Apply Online Steps

    The order of steps for permitting a small meter permit.

    1. Submit a small meter permit application
    2. Pay for a permit
    3. Receive a permit Work order

    Please see the Small Meter Permit Requirements Guide to reference the documents needed for your use and additional considerations.

    Apply Conditions & Exceptions
    1. The property must have direct access to the City of Houston water mains. Property that does not have direct access to water mains requires prior approval from the Infrastructure Support Group.
    2. The water main must be at least 4” in size and less than 20”. Property with direct access to water mains 20” and larger require prior approval
    3. The tap must be the same size as the water meter excluding the 5/8” meter which has a 3/4” tap.
    4. Impact fees, if required, must be paid before the water meter can be set up. Projects with conditional WCR letters, House for House, and/or qualifying impact fee exemption residential development are exempt from impact fee payment prior to water meter set up.
    5. A contractor from the City of Houston Taps and Meters Approved Contractors List shall be selected to install the meter. The City does not install water meters nor does it pay for the installation. The list is updated on the first of each month.
    Plan Review What you need

    Review is completed by the Customer Account Services. If the application is accepted, the deposit (if required) is processed and the Inspection team is notified.

    Plan Review Submit in Person Steps

    If additional information is required, visit 1002 Washington Ave., 3rd floor.

    Inspection What you need

    The Inspections team at Customer Account Services will review the job and issue a work order to the plumber via email. When the work is completed, the plumber must schedule an inspection via email. It takes approximately 48 hours for the inspector to bring out the meter to the job site.


    Source URL: https://www.houstonpermittingcenter.org/hpwua1011