Use a mixture of filters or keywords to find documents and resources by department, type or topic.

24 Technical Memo, IFC-Combustible Dust.pdf

This technical memo is provided to describe the significant changes to the Houston Construction Code with regard to the new changes related to the requirements of combustible dust. 

Uploaded 2-13-2024

00609 List Of Non Diesel Equipment
Pipeline Permit Procedures

Procedures for permitting pipeline street crossings and application checklist. 

Last updated: March 2019

00110 City Engineer
Code Word 2012-B49 Definitions Related to Administrative Processes

Definition terms related to existing building alterations that are used for administrative processes associated with plan review and permitting. 

Non-Licensed User Guide

How-To Guide for Non-Licensed User Accounts

Airport Land Use - Sound Attenuation Form (CE1202)

This form is to assist in the plan review, permit and inspection process for those properties that have been required by the Airport Land Use ordinance to meet sound attenuation requirements. This form is to be completed by the designer or builder to ensure that either the prescriptive code requirements are met or an approved assembly is utilized to meet the requirements in the building code.

Last updated: March 2024

Ordinance Notes and Plat Notes
22-03-R, 1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall)

1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall) 

Updated 01/17/2023

22-04-R, 1-Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Knee Wall)

1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Knee Wall) 

Revised 01/17/2023