Use a mixture of filters or keywords to find documents and resources by department, type or topic.

List of Registered Fabricators

The fabricators on this list have been certified by a third-party agency and approved by the City of Houston to produce or fabricate primary structural components for buildings.

Last updated: 04/10/2024

16 Technical Memo, Occupant Load Factor Changes.pdf

This technical memo is provided to describe the changes to the Houston Construction Codes with regards to a significant change in the base code related to the requirements for occupant load factors. 

Uploaded 2-13-2024

2017 Special Waste Transporter Application

Application Instructions for Transporters

16-02-R Fire - Resistance Rated Soffit Assembly

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Guidelines for a Successful Mylar Walk Through

Guidelines for a successful mylar walk through.

Last updated: 12/6/2019 

00496 Control Form For Contract Documents
00520 Agreement
Example Plan & Profile (pdf)
COH Plan and Profile
Make Sign Survey Payments Online

Online guide to pay sign surveys

Last updated:  June 23, 2023