Use a mixture of filters or keywords to find documents and resources by department, type or topic.

02502-03 12 Diameter Waterline Crossing (DWG)
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated 07/14/2020

House Moving brochure (CE1290)

Permitting and inspection information for house moving.

Last updated: 1/1/2016

Non-Licensed User Guide

How-To Guide for Non-Licensed User Accounts

02502-02 16 Diameter Waterline Aerial (DWG)
Emergency Responder Radio Coverage Guideline with Example (CE1350)

Permitting and plan review guideline for EERC with example inspection report.

Last updated: 11/25/2019

Sidewalk Panel Completion

Notice of completion for sidewalk panel replacement work.

Rules for Waiver Request for the Temporary Placement of Manufacture Home due to Harvey (CE1322)

Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.

Last updated: 2/14/2018

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 09-01-2021

Notice of Sidewalk Panel Replacement

Notice to begin sidewalk panel replacement work.