Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated 07/14/2020

Manufactured Homes brochure (CE1289)

This guide provides the requirements for the placement and reconnection of manufactured homes.

Last updated: 5/3/2017

TxDOT Water Details
Substantial Damage Determination Request Form

Substantial Damage Determination Request Form.

Sidewalk Panel Replacement Guide

Sidewalk Panel Replacement Guide.

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 09-01-2021

Approved Fabricator Guidelines (CE1285)

Guide explains the requirements and procedures of the COH approved fabricator program. 

Last updated: 01-01-2022

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2022

Residential Elevator Permit Application (CE1332)

For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.

Last updated: 01-01-2022

Commercial Elevator Permit Application (CE1331)

For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.

Last updated: 01-01-2022