Use a mixture of filters or keywords to find documents and resources by department, type or topic.
This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.
Last updated: Nov. 17, 2022
Please contact us at the information below.
Phone: 832.393.5603 and can also Email: [email protected].
This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.
Last updated 07/14/2020
Permitting, plan review and inspection guidelines for electric vehicle charging station.
Last updated: 10/22/2019
Prerequisites Plan Procedures.
Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.
Last updated: 2/14/2018
Step by step guide on how to schedule an appointment online and to check-in for your appointment.
Last updated: 6/27/2014