Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Non-Licensed User Guide

How-To Guide for Non-Licensed User Accounts

Post Install Solar Inspection Letter (CE-1387b)

This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.

Last updated: Nov. 17, 2022 

Vehicle Updates and Changes form

Please contact us at the information below.
Phone: 832.393.5603 and can also Email: [email protected].

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated 07/14/2020

Chapter 19 Floodplain Guidelines

Chapter 19 Floodplain Guidelines.

Ordinance Notes and Plat Notes
Electric Vehicle Charging Station Permit Guideline (CE1256)

Permitting, plan review and inspection guidelines for electric vehicle charging station.

Last updated: 10/22/2019

2147 Prerequisites Plan Procedures

Prerequisites Plan Procedures.

Rules for Waiver Request for the Temporary Placement of Manufacture Home due to Harvey (CE1322)

Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.

Last updated: 2/14/2018

Appointment Scheduler and Check-in Guide for Plan Review

Step by step guide on how to schedule an appointment online and to check-in for your appointment.

Last updated: 6/27/2014