Use a mixture of filters or keywords to find documents and resources by department, type or topic.
12-08-R Example site plan for drainage requirements
Example site plan for drainage requirements.
Public Hearing - Replat With Notification
Last Updated: June 2015
18-04-R Residential Garage Dwelling Separation
22-03-R, 1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall)
1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall)
Updated 01/17/2023
18-02-R Two family dwelling vertical separation
Two family dwelling vertical separation
22-04-R, 1-Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Knee Wall)
1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Knee Wall)
Revised 01/17/2023
22-05-R, 1-Hour Fire-Rated Wood Stud Exterior Wall
1 Hour Fire-Rated Wood Stud Exterior Wall
Revised 01/17/2023
01562-01 Tree Protection General Requirements
Transient Meter Application Procedures
Application procedures for renting a transient meter.
Last updated: 12/15/2022