Use a mixture of filters or keywords to find documents and resources by department, type or topic.

02083-02 5'-0 to 8'-0 Diameter Fiberglass Manhole
02534-01 Service Reconnection For Liner Pipe
02082-04 Pile Supported Manhole For Unstable Subgrade
02091-01 (2020 Detail)

2020 Detail for 02091-01 Non-Metallic Manhole Frame and Cover

02912-01 Tree Root Barriers (Circular)

02912-01 Tree Root Barriers (Circular)

02091-01 Non- Metallic Frame and Cover

2021 Detail for 02091-01 Non-Metallic Frame and Cover (effective October 1, 2021)

 

Last updated: July 6, 2021

02083-03 Fiberglass Manhole With Cast-In-Place Base
Advance Pay Account Guidelines (CE1051)

Guidelines for opening and using an advance pay account (APA).

Last updated: May 9, 2023

02082-02 4'-0" Diameter Precast Concrete Manhole
Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2023