Impact Fee Service Unit Equivalent Table (UA005)

Service unit equivalent table for determining impact fees. (form UA005)

Last updated: May 20, 2021 

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019

Fire Hydrant Installation and Relocation Procedure

Procedures for obtaining a permit to install or relocate a fire hydrant.

Last updated: 7/1/2017

Water Main Abandonment Procedure

Procedures for obtaining a water main abandonment permit.

Last updated: 1/1/2019

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Sewer Main Extension Procedure

Procedures for obtaining a permit for lateral sanitary sewer main extension.

Last updated: 8/1/2018

Sewer Tap Permit Procedure

Procedures for obtaining a sanitary sewer tap permit.

Last updated: 8/1/2018

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

Large Meter Permit Requirements

Permitting requirements and procedures for obtaining large water meter permits.

Last updated: 10/14/2021