Pedestrian Protection Permit Guideline (CE1124)

This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.

Last updated: 01-01-2022

Emergency Responder Radio Coverage Guideline with Example (CE1350)

Permitting and plan review guideline for EERC with example inspection report.

Last updated: 11/25/2019

Extraterritorial Jurisdiction Plan Review and Submittal Requirements (CE1041)

Extraterritorial Jurisdiction “ETJ” is all unincorporated territory extending 5 miles beyond the corporate boundaries of the city limits of Houston as established by Chapter 42 – Texas Local Government code.

Last updated: 01/01/2022

Electric Vehicle Charging Station Permit Guideline (CE1256)

Permitting, plan review and inspection guidelines for electric vehicle charging station.

Last updated: 10/22/2019

Guidelines for a Successful Mylar Walk Through

Guidelines for a successful mylar walk through.

Last updated: 12/6/2019 

Phased Construction Permitting Options (CE1098)

Options for phase construction permitting and plan review

Last updated: 10/08/2019

Swimming Pool Demolition Guidelines (CE1090)

The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.

Last updated: 01-01-2021

Sign Administration Procedures for Paid Plan Review (CE 1335)

Procedures and qualifications for paid plan review (customer paid overtime).

 

Last updated: 1/1/2020

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2022