Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019

Emergency Responder Radio Coverage Guideline with Example (CE1350)

Permitting and plan review guideline for EERC with example inspection report.

Last updated: 11/25/2019

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Electric Vehicle Charging Station Permit Guideline (CE1256)

Permitting, plan review and inspection guidelines for electric vehicle charging station.

Last updated: 10/22/2019

Water Main Abandonment Procedure

Procedures for obtaining a water main abandonment permit.

Last updated: 1/1/2019

Rules for Waiver Request for the Temporary Placement of Manufacture Home due to Harvey (CE1322)

Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.

Last updated: 2/14/2018

Sewer Main Extension Procedure

Procedures for obtaining a permit for lateral sanitary sewer main extension.

Last updated: 8/1/2018

Swimming Pool Demolition Guidelines (CE1090)

The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.

Last updated: 01-01-2021

Large Meter Permit Requirements

Permitting requirements and procedures for obtaining large water meter permits.

Last updated: 10/14/2021

Ordinance Notes and Plat Notes