Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Workflow diagram of the letter of map change process for CLOMR, LOMR-F, and LOMA.
Last updated: July 22, 2019
Second example of a completed code change proposal form.
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: 01-01-2023
Quick reference guide to flood damage repairs in the floodplain.
Procedures for obtaining a water main offset permit.
Last updated: 1/1/2019