Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Security Control Plan
Water Main Abandonment Procedure

Procedures for obtaining a water main abandonment permit.

Last updated: 1/1/2019

Sewer Main Extension Procedure

Procedures for obtaining a permit for lateral sanitary sewer main extension.

Last updated: 8/1/2018

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019

PPI 2021

Public information plan for the Community Rating System.

 

Last updated: 1.21.2021

Code Change Proposal Example 2

Second example of a completed code change proposal form.

TxDOT Ramp Closure Requirements

This document is maintained by the Texas Department of Transportation (TxDOT).

Garbage Collection Plan - Chapter 42 Amendments

A Garbage Collection Plan is required for a development or subdivision that contains lots that take access from private streets, permanent access easements, or shared driveways located inside the City of Houston Corporate Limits, that proposes 25 residential units or less.

Sidewalk and Roadway Obstructions and Impairments Ordinance Rules and Regulations

Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance