Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Permitting, plan review and inspection guidelines for electric vehicle charging station.
Last updated: 10/22/2019
Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.
Last updated: 2/14/2018
A Garbage Collection Plan is required for a development or subdivision that contains lots that take access from private streets, permanent access easements, or shared driveways located inside the City of Houston Corporate Limits, that proposes 25 residential units or less.
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. Listed below are the required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process.
Last updated: 04/12/2022
Quick reference guide to flood damage repairs in the floodplain.
Workflow diagram of the letter of map change process for CLOMR, LOMR-F, and LOMA.
Last updated: July 22, 2019
City of Houston, Texas, Ordinance Number 2007-777. An ordinance amending the City of Houston Fire Code relating to administrative fees.