Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Guidelines for a successful mylar walk through.
Last updated: 12/6/2019
Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.
Last updated: 2/14/2018
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: 01-01-2023
In an attempt to reduce the number of plan submittals, the following items are required in the construction documents for all Residential Site Improvement projects.
Last updated: 10/15/2019
The Commercial Plan Review process will enable your building and improvement plans to be reviewed for Houston Construction Code compliance prior to issuance of a building permit.
Last updated: 01/01/2023
Permitting, plan review and inspection guidelines for electric vehicle charging station.
Last updated: 10/22/2019
This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.
Last updated: 01-01-2023
Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance